summaryrefslogtreecommitdiff
path: root/kernel
diff options
context:
space:
mode:
authorDaniel Bristot de Oliveira <bristot@redhat.com>2017-03-02 17:10:57 +0300
committerIngo Molnar <mingo@kernel.org>2017-03-16 11:37:37 +0300
commit5ac69d37784b237707a7b15d199cdb6c6fdb6780 (patch)
treed043bb1b23465a7d4e7eed866d169e41878aad0b /kernel
parentcaeb5882979bc6f3c8766fcf59c6269b38f521bc (diff)
downloadlinux-5ac69d37784b237707a7b15d199cdb6c6fdb6780.tar.xz
sched/deadline: Make sure the replenishment timer fires in the next period
Currently, the replenishment timer is set to fire at the deadline of a task. Although that works for implicit deadline tasks because the deadline is equals to the begin of the next period, that is not correct for constrained deadline tasks (deadline < period). For instance: f.c: --------------- %< --------------- int main (void) { for(;;); } --------------- >% --------------- # gcc -o f f.c # trace-cmd record -e sched:sched_switch \ -e syscalls:sys_exit_sched_setattr \ chrt -d --sched-runtime 490000000 \ --sched-deadline 500000000 \ --sched-period 1000000000 0 ./f # trace-cmd report | grep "{pid of ./f}" After setting parameters, the task is replenished and continue running until being throttled: f-11295 [003] 13322.113776: sys_exit_sched_setattr: 0x0 The task is throttled after running 492318 ms, as expected: f-11295 [003] 13322.606094: sched_switch: f:11295 [-1] R ==> watchdog/3:32 [0] But then, the task is replenished 500719 ms after the first replenishment: <idle>-0 [003] 13322.614495: sched_switch: swapper/3:0 [120] R ==> f:11295 [-1] Running for 490277 ms: f-11295 [003] 13323.104772: sched_switch: f:11295 [-1] R ==> swapper/3:0 [120] Hence, in the first period, the task runs 2 * runtime, and that is a bug. During the first replenishment, the next deadline is set one period away. So the runtime / period starts to be respected. However, as the second replenishment took place in the wrong instant, the next replenishment will also be held in a wrong instant of time. Rather than occurring in the nth period away from the first activation, it is taking place in the (nth period - relative deadline). Signed-off-by: Daniel Bristot de Oliveira <bristot@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Reviewed-by: Luca Abeni <luca.abeni@santannapisa.it> Reviewed-by: Steven Rostedt (VMware) <rostedt@goodmis.org> Reviewed-by: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Romulo Silva de Oliveira <romulo.deoliveira@ufsc.br> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: Tommaso Cucinotta <tommaso.cucinotta@sssup.it> Link: http://lkml.kernel.org/r/ac50d89887c25285b47465638354b63362f8adff.1488392936.git.bristot@redhat.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel')
-rw-r--r--kernel/sched/deadline.c9
1 files changed, 7 insertions, 2 deletions
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index c6db3fd727fe..445e2787bf80 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -505,10 +505,15 @@ static void update_dl_entity(struct sched_dl_entity *dl_se,
}
}
+static inline u64 dl_next_period(struct sched_dl_entity *dl_se)
+{
+ return dl_se->deadline - dl_se->dl_deadline + dl_se->dl_period;
+}
+
/*
* If the entity depleted all its runtime, and if we want it to sleep
* while waiting for some new execution time to become available, we
- * set the bandwidth enforcement timer to the replenishment instant
+ * set the bandwidth replenishment timer to the replenishment instant
* and try to activate it.
*
* Notice that it is important for the caller to know if the timer
@@ -530,7 +535,7 @@ static int start_dl_timer(struct task_struct *p)
* that it is actually coming from rq->clock and not from
* hrtimer's time base reading.
*/
- act = ns_to_ktime(dl_se->deadline);
+ act = ns_to_ktime(dl_next_period(dl_se));
now = hrtimer_cb_get_time(timer);
delta = ktime_to_ns(now) - rq_clock(rq);
act = ktime_add_ns(act, delta);