diff options
author | Chanho Min <chanho0207@gmail.com> | 2012-01-05 15:00:19 +0400 |
---|---|---|
committer | Ingo Molnar <mingo@elte.hu> | 2012-01-27 15:49:41 +0400 |
commit | cb297a3e433dbdcf7ad81e0564e7b804c941ff0d (patch) | |
tree | 1b6dde74b50fa074e7eec8bd6ef5adacff9b6ce1 /arch/x86 | |
parent | b5740f4b2cb3503b436925eb2242bc3d75cd3dfe (diff) | |
download | linux-cb297a3e433dbdcf7ad81e0564e7b804c941ff0d.tar.xz |
sched/rt: Fix task stack corruption under __ARCH_WANT_INTERRUPTS_ON_CTXSW
This issue happens under the following conditions:
1. preemption is off
2. __ARCH_WANT_INTERRUPTS_ON_CTXSW is defined
3. RT scheduling class
4. SMP system
Sequence is as follows:
1.suppose current task is A. start schedule()
2.task A is enqueued pushable task at the entry of schedule()
__schedule
prev = rq->curr;
...
put_prev_task
put_prev_task_rt
enqueue_pushable_task
4.pick the task B as next task.
next = pick_next_task(rq);
3.rq->curr set to task B and context_switch is started.
rq->curr = next;
4.At the entry of context_swtich, release this cpu's rq->lock.
context_switch
prepare_task_switch
prepare_lock_switch
raw_spin_unlock_irq(&rq->lock);
5.Shortly after rq->lock is released, interrupt is occurred and start IRQ context
6.try_to_wake_up() which called by ISR acquires rq->lock
try_to_wake_up
ttwu_remote
rq = __task_rq_lock(p)
ttwu_do_wakeup(rq, p, wake_flags);
task_woken_rt
7.push_rt_task picks the task A which is enqueued before.
task_woken_rt
push_rt_tasks(rq)
next_task = pick_next_pushable_task(rq)
8.At find_lock_lowest_rq(), If double_lock_balance() returns 0,
lowest_rq can be the remote rq.
(But,If preemption is on, double_lock_balance always return 1 and it
does't happen.)
push_rt_task
find_lock_lowest_rq
if (double_lock_balance(rq, lowest_rq))..
9.find_lock_lowest_rq return the available rq. task A is migrated to
the remote cpu/rq.
push_rt_task
...
deactivate_task(rq, next_task, 0);
set_task_cpu(next_task, lowest_rq->cpu);
activate_task(lowest_rq, next_task, 0);
10. But, task A is on irq context at this cpu.
So, task A is scheduled by two cpus at the same time until restore from IRQ.
Task A's stack is corrupted.
To fix it, don't migrate an RT task if it's still running.
Signed-off-by: Chanho Min <chanho.min@lge.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Acked-by: Steven Rostedt <rostedt@goodmis.org>
Cc: <stable@kernel.org>
Link: http://lkml.kernel.org/r/CAOAMb1BHA=5fm7KTewYyke6u-8DP0iUuJMpgQw54vNeXFsGpoQ@mail.gmail.com
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Diffstat (limited to 'arch/x86')
0 files changed, 0 insertions, 0 deletions